CR-31-1: GE Frame 5 L, Last major overhaul in 1992, 2nd Stage tie Wire, Unit installed in 1968, Designed for 14,125 KW Rating, Tested at 11,960 KW, Voltage 12,600, Diesel Starting Means, Dual Fuel Gas/#2 Oil, WDPF Controls, Screened Air Inlet, Exhaust re-Stacked in 1992 by Transco, 2700? Hours of Operation since last Major overhaul.

CR-31-2: GE Frame 5 L, Last major Overhaul in 1999, Unit Installed in 1968, Designed at 14,125 KW, Tested at 11,950 KW, Voltage 12,600, Diesel Starting Means, WDPF Controls, Dual Fuel Gas/#2 Oil, Screened Air Inlet, Exhaust Restacked in 1992 by Transco, 1430 Hours operational since last Major Overhaul.

CR-31-3: GE Frame 5 L, Unit Installed in 1968, 2nd Stage Tie Wire, designed at 14,125 KW, Tested at 11,960 KW, Voltage Rating at 12,600 V, last major overhaul not available, Generator rewind in 1998, WDPF Controls, Diesel Starting Means, Dual Fuel Gas/#2 Oil, Screened Air Inlet, Exhaust restacked in 1992 by Transco, Less than 2700 operational hours since last Major Overhaul.

CR-31-4: GE Frame 5 L, Unit Installed in 1968, last major overhaul not available, 2nd Stage tie Wire, Designed at 14,125 KW, Tested at 11,960 KW, WDPF Controls, Voltage at 12,600V, Diesel Starting Means, Dual Fuel gas/#2 Oil, Screened Air Inlet, exhaust restacked in 1992 by Transco, Unit has less than 2700 hours of operation since last major overhaul.

CR-32-1: GE Frame 5 L, Unit Installed in 1968, Last major Overhaul in 1993, 14,125 KW Designed rating, Tested at 11,125 KW, 12,600 volts, 2nd Stage Tie Wire, Generator rewind in 1993, WDPF Controls, Diesel Starting means, Dual Fuel gas/#2 Oil, Screened Air Inlet, Exhaust Restacked in 1992 by Transco, Unit has 2625 hours of operation since last major overhaul.

CR-32-2: GE frame 5 L, Unit Installed in 1968 Last major Overhaul in 1993, 14,125 KW Designed rating, Tested at 11,125 KW, 12,600 volts, 2nd Stage Tie Wire, Generator rewind in 1995, WDPF Controls, Diesel Starting means, Dual Fuel gas/#2 Oil, Screened Air Inlet, Exhaust Restacked in 1992 by Transco, Unit has 2605 hours of operation since last major overhaul.

CR-32-3: GE Frame 5 L, Unit Installed in 1968, Last major Overhaul in 1993, 14,125 KW Designed rating, Tested at 11,125 KW, 12,600 volts, 2nd Stage Tie Wire, WDPF Controls, Diesel Starting means, Dual Fuel gas/#2 Oil, Screened Air Inlet, Exhaust Restacked in 1992 by Transco, Unit has 2625 hours of operation since last major overhaul.

CR-32-4: GE Frame 5 L, Unit Installed in 1968, Last major Overhaul in 1994, 14,125 KW Designed rating, Tested at 11,125 KW, 12,600 volts, Generator rewind in 1993-serviced in 1994, 2nd Stage Tie Wire, WDPF Controls, Diesel Starting means, Dual Fuel gas/#2 Oil, Screened Air Inlet, Exhaust Restacked in 1992 by Transco, Unit has 2625 hours of operation since last major overhaul.

CR-33-1: GE Frame 5 L, Unit Installed in 1968, Last major Overhaul in 1993, 14,125 KW Designed rating, Tested at 11,330 KW, 12,600 volts, 2nd Stage Tie Wire, WDPF Controls, Diesel Starting means, Dual Fuel Gas/#2 Oil, Screened Air Inlet, Exhaust Restacked in 1992 by Transco, Unit has 2365 hours of operation since last major overhaul.

CR-33-2: GE Frame 5 L, Unit Installed in 1968, Last major Overhaul in 1993, 14,125 KW Designed rating, Tested at 11,330 KW, 12,600 volts, Generator serviced in 1993, 2nd Stage Tie Wire, WDPF Controls, Diesel Starting means, Dual Fuel gas/#2 Oil, Screened Air Inlet, Exhaust Restacked in 1992 by Transco, Unit has 2320 hours of operation since last major overhaul.

CR-33-3: GE Frame 5 L, Unit Installed in 1968, Last major Overhaul not available unit not operational (broken second stage blade tips), 14,125 KW Designed rating, Tested at 11,330 KW, 12,600 volts, 2nd Stage Tie Wire, WDPF Controls, Diesel Starting means, Dual Fuel gas/#2 Oil, Screened Air Inlet, Exhaust Restacked in 1992 by Transco, Unit has 2340 hours of operation since last major overhaul.

CR-33-4: GE Frame 5 L, Unit Installed in 1968, Last major Overhaul in 1993, 14,125 KW Designed rating, Tested at 11,330 KW, 12,600 volts, Generator rewind in 1995- serviced in 1995, 2nd Stage Tie Wire, WDPF Controls, Diesel Starting means, Dual Fuel gas/#2 Oil, Screened Air Inlet, Exhaust Restacked in 1992 by Transco, Unit has 2340 hours of operation since last major overhaul.



G.E. Frame 5 LA
 

CA-31-1: GE Frame 5 LA, Unit installed in 1969, 15,125 KW Rating, 12,600 Volts, Last Major overhaul in 1998, 2nd Stage tie Wire, Generator rewind in 1991, WDPF Controls, Diesel Starting Means, Dual Fuel gas/#2 Oil, Screened Air Inlet, Exhaust restacked in 1995 by Transco, Unit has 1,185 hours operating since last Major overhaul.

CA-31-2: GE Frame 5 LA, Unit installed in 1969, 15,125 KW Rating, 12,600 Volts, Last Major overhaul in 1993, 2nd Stage tie Wire, Generator rewind in 1991, WDPF Controls, Diesel Starting Means, Dual Fuel gas/#2 Oil, Screened Air Inlet, Exhaust restacked in 1995 by Transco, Unit has 1,090 hours operating since last Major overhaul.

CA-31-3: GE Frame 5 LA, Unit installed in 1969, 15,125 KW Rating, 12,600 Volts, Last Major overhaul in 1995, 2nd Stage tie Wire, Generator rewind in 1992, WDPF Controls, Diesel Starting Means, Dual Fuel gas/#2 Oil, Screened Air Inlet, Exhaust restacked in 1995 by Transco, Unit has 1,540 hours operating since last Major overhaul.

CA-31-4: GE Frame 5 LA, Unit installed in 1969, 15,125 KW Rating, 12,600 Volts, Last Major overhaul in 1995, 2nd Stage tie Wire, Generator rewind not available, WDPF Controls, Diesel Starting Means, Dual Fuel gas/#2 Oil, Screened Air Inlet, Exhaust restacked in 1995 by Transco, Unit has 1,530 hours operating since last Major overhaul.

CA-33-1: GE Frame 5 LA, Unit installed in 1969, 15,125 KW Rating, 12,600 Volts, Last Major overhaul in 1992, 2nd Stage tie Wire, Generator rewind not available, WDPF Controls, Diesel Starting Means, Dual Fuel gas/#2 Oil, Screened Air Inlet, Exhaust restacked in 1995 by Transco, Unit has 1,545 hours operating since last Major overhaul.

CA-33-2: GE Frame 5 LA, Unit installed in 1969, 15,125 KW Rating, 12,600 Volts, Last Major overhaul in 1997, 2nd Stage tie Wire, Generator rewind not available, WDPF Controls, Diesel Starting Means, Dual Fuel gas/#2 Oil, Screened Air Inlet, Exhaust restacked in 1995 by Transco, Unit has 1,005 hours operating since last Major overhaul.

CA-33-3: GE Frame 5 LA, Unit installed in 1969, 15,125 KW Rating, 12,600 Volts, Last Major overhaul in 1998, 2nd Stage tie Wire, Generator rewind in 1991, WDPF Controls, Diesel Starting Means, Dual Fuel gas/#2 Oil, Screened Air Inlet, Exhaust restacked in 1995 by Transco, Unit has 855 hours operating since last Major overhaul.

CA-34-1: GE Frame 5 LA, Unit installed in 1969, 16,185 KW Rating, 12,600 Volts, Last Major overhaul in 1994, 2nd Stage tie Wire, Generator rewind in 1992, WDPF Controls, Diesel Starting Means, Dual Fuel gas/#2 Oil, Screened Air Inlet, Exhaust restacked in 1995 by Transco, Unit has 1,385 hours operating since last Major overhaul.

CA-34-2: GE Frame 5 LA, Unit installed in 1969, 16,185 KW Rating, 12,600 Volts, Last Major overhaul in 1997, 2nd Stage Shrouded in 2002, Generator rewind in 1998, WDPF Controls, Diesel Starting Means, Dual Fuel gas/#2 Oil, Screened Air Inlet, Exhaust restacked in 1995 by Transco, Unit has 975 hours operating since last Major overhaul.

CA-34-3: GE Frame 5 LA, Unit installed in 1969, 16,185 KW Rating, 12,600 Volts, Last Major overhaul in 1996, 2nd Stage Shrouded in 2002, Generator rewind not available, WDPF Controls, Diesel Starting Means, Dual Fuel gas/#2 Oil, Screened Air Inlet, Exhaust restacked in 1995 by Transco, Unit has 1,170 hours operating since last Major overhaul.

CA-34-4: GE Frame 5 LA, Unit installed in 1969, 16,185 KW Rating, 12,600 Volts, Last Major overhaul in 1997, 2nd Stage Shrouded in 2002, Generator rewind in 1997 serviced in 1997, WDPF Controls, Diesel Starting Means, Dual Fuel gas/#2 Oil, Screened Air Inlet, Exhaust restacked in 1995 by Transco, Unit has 990 hours operating since last Major overhaul.

EJ-31-1: GE Frame 5 LA, Unit Installed in 1970, 16,200 KW Rating, Last Major Overhaul in 2004, Tested at 12,900 KW, Generator rewind R-1994, 13,800 Volts, 2nd Stage Tie Wire, Diesel Starting Means, Dual Fuel Gas/#2 Oil, WDPF Controls, Screened Air Inlet, Exhaust restacked in 1994 by Transco, Unit has 1690 hours operating since last Major overhaul.

EJ-31-2: GE Frame 5 LA, Unit Installed in 1970, 16,200 KW Rating, Last major Overhaul in 1997, Tested at 12,900 KW, Generator rewind R-1997, 13,800 Volts, 2nd Stage Tie Wire, Electric Starting Means, Dual Fuel Gas/#2 Oil, WDPF Controls, Screened Air Inlet, Exhaust restacked in 1994 by Transco, Unit has 2,775 hours operating since last Major overhaul.

EJ-31-3: GE Frame 5 LA, Unit Installed in 1970, 16,200 KW Rating, Last major overhaul in 2004, Tested at 12,900 KW, Generator rewind R-1992, 13,800 Volts, 2nd Stage Tie Wire, Electric Starting Means, Dual Fuel Gas/#2 Oil, WDPF Controls, Screened Air Inlet, Exhaust restacked in 1994 by Transco, Unit has 1,310 hours operating since last Major overhaul.

EJ-31-4: GE Frame 5 LA, Unit Installed in 1970, 16,200 KW Rating, Last major overhaul in 1994, Tested at 12,900 KW, Generator rewind R-1994, 13,800 Volts, 2nd Stage Tie Wire, Electric Starting Means, Dual Fuel Gas/#2 Oil, WDPF Controls, Screened Air Inlet, Exhaust restacked in 1994 by Transco, Unit has 3,565 hours operating since last Major overhaul.

EJ-32-1: GE Frame 5 LA, Unit Installed in 1970, 16,200 KW Rating, Last major overhaul in 2000, Tested at 13,000 KW, Generator rewind R-1995, 13,800 Volts, 2nd Stage Tie Wire, Diesel Starting Means, Dual Fuel Gas/#2 Oil, WDPF Controls, Screened Air Inlet, Exhaust restacked in 1994 by Transco, Unit has 1,340 hours operating since last Major overhaul.

EJ-32-2: GE Frame 5 LA, Unit Installed in 1970, 16,200 KW Rating, Last major overhaul in 2004, Tested at 13,000 KW, Generator rewind not available, 13,800 Volts, 2nd Stage Shrouded in 1985, Electric Starting Means, Dual Fuel Gas/#2 Oil, WDPF Controls, Screened Air Inlet, Exhaust restacked in 1994 by Transco, Unit has less than 3350 hours operating since last Major overhaul.

EJ-32-3: GE Frame 5 LA, Unit Installed in 1970, 16,200 KW Rating, Last major overhaul in 1994, Tested at 13,000 KW, Generator rewind R-1994, 13,800 Volts, 2nd Stage Tie Wire, Electric Starting Means, Dual Fuel Gas/#2 Oil, WDPF Controls, Screened Air Inlet, Exhaust restacked in 1994 by Transco, Unit has 3,215 hours operating since last Major overhaul.

EJ-32-4: GE Frame 5 LA, Unit Installed in 1970, 16,200 KW Rating, Last major overhaul in 1997, Tested at 13,000 KW, Generator rewind not available, 13,800 Volts, 2nd Stage Tie Wire, Electric Starting Means, Dual Fuel Gas/#2 Oil, WDPF Controls, Screened Air Inlet, Exhaust restacked in 1994 by Transco, Unit has 2,850 hours operating since last Major overhaul.

EJ-33-1: GE Frame 5 LA, Unit Installed in 1970, 16,200 KW Rating, Last major overhaul in 1994, Tested at 13,230 KW, Generator rewind R-1992, 13,800 Volts, 2nd Stage Tie Wire, Diesel Starting Means, Dual Fuel Gas/#2 Oil, WDPF Controls, Screened Air Inlet, Exhaust restacked in 1994 by Transco, Unit has 3170 hours operating since last Major overhaul.

EJ-33-2: GE Frame 5 LA, Unit Installed in 1970, 16,200 KW Rating, Last major overhaul in 1997, Tested at 13,230 KW, Generator rewind not available, 13,800 Volts, 2nd Stage Tie Wire, Electric Starting Means, Dual Fuel Gas/#2 Oil, WDPF Controls, Screened Air Inlet, Exhaust restacked in 1994 by Transco, Unit has 2,700 hours operating since last Major overhaul.

EJ-33-3: GE Frame 5 LA, Unit Installed in 1970, 16,200 KW Rating, Last major overhaul in 1998, Tested at 13,230 KW, Generator rewind not available, 13,800 Volts, 2nd Stage Tie Wire, Electric Starting Means, Dual Fuel Gas/#2 Oil, WDPF Controls, Screened Air Inlet, Exhaust restacked in 1994 by Transco, Unit has 2,270 hours operating since last Major overhaul.

JO-31-1: GE Frame 5 LA, Unit Installed in 1969, 15,125 KW Rating, Last major overhaul in 1977, Generator rewind R-1989, 12,600 Volts, 2nd Stage Tie Wire, Electric Starting Means, Dual Fuel Gas/#2 Oil, WDPF Controls, Screened Air Inlet, Exhaust restacked in 1993 by Transco, Unit has over 3,500 hours operating since last Major overhaul.

JO-31-2: GE Frame 5 LA, Unit Installed in 1969, 15,125 KW Rating, Last major overhaul in 1979, Generator rewind R-1978, 12,600 Volts, 2nd Stage Tie Wire, Electric Starting Means, Dual Fuel Gas/#2 Oil, WDPF Controls, Screened Air Inlet, Exhaust restacked in 1993 by Transco, Unit has over 3,500 hours operating since last Major overhaul.

JO-31-3: GE Frame 5 LA, Unit Installed in 1969, 15,125 KW Rating, Last major overhaul in 2001, Generator rewind not available, 12,600 Volts, 2nd Stage Tie Wire, Electric Starting Means, Dual Fuel Gas/#2 Oil, WDPF Controls, Screened Air Inlet, Exhaust restacked in 1993 by Transco, Unit has 635 hours operating since last Major overhaul.

JO-31-4: GE Frame 5 LA, Unit Installed in 1969, 15,125 KW Rating, Last major overhaul in 1996, Generator rewind not available, 12,600 Volts, 2nd Stage Tie Wire, Electric Starting Means, Dual Fuel Gas/#2 Oil, WDPF Controls, Screened Air Inlet, Exhaust restacked in 1993 by Transco, Unit has 2,970 hours operating since last Major overhaul.

JO-32-1: GE Frame 5 LA, Unit Installed in 1969, 15,125 KW Rating, Last major overhaul in 1996, Generator rewind not available, 12,600 Volts, 2nd Stage Shrouded in 2001 , Electric Starting Means, Dual Fuel Gas/#2 Oil, WDPF Controls, Screened Air Inlet, Exhaust restacked in 1993 by Transco, Unit has 2,850 hours operating since last Major overhaul.

JO-32-2: GE Frame 5 LA, Unit Installed in 1969, 15,125 KW Rating, Last major overhaul in 2003, Generator rewind R-1994, 12,600 Volts, 2nd Stage Shrouded in 2003 , Electric Starting Means, Dual Fuel Gas/#2 Oil, WDPF Controls, Screened Air Inlet, Exhaust restacked in 1993 by Transco, Unit has 285 hours operating since last Major overhaul.

JO-32-3: GE Frame 5 LA, Unit Installed in 1969, 15,125 KW Rating, Last major overhaul in 2003, Generator rewind R-2000, 12,600 Volts, 2nd Stage Shrouded in 2001 , Electric Starting Means, Dual Fuel Gas/#2 Oil, WDPF Controls, Screened Air Inlet, Exhaust restacked in 1993 by Transco, Unit has 230 hours operating since last Major overhaul.

JO-32-4: GE Frame 5 LA, Unit Installed in 1969, 15,125 KW Rating, Last major overhaul in 2001, Generator rewind R-1992, 12,600 Volts, 2nd Stage Tie Wire, Electric Starting Means, Dual Fuel Gas/#2 Oil, WDPF Controls, Screened Air Inlet, Exhaust restacked in 1993 by Transco, Unit has ?665 hours operating since last Major overhaul.

SA-31-1: GE Frame 5 LA, Unit Installed in 1969, 15,125 KW Rating, Tested at 13,100, Last major overhaul in 1990, Generator rewind not available, 12,600 Volts, 2nd Stage Tie Wire, Electric Starting Means, Dual Fuel Gas/#2 Oil, Ovation Controls, Screened Air Inlet, Exhaust restacked not available, Unit has less than 2100 hours operating since last Major overhaul.

SA-31-2: GE Frame 5 LA, Unit Installed in 1969, 15,125 KW Rating, Last major overhaul in 1991, Generator rewind R-1991, 12,600 Volts, 2nd Stage Tie Wire, Electric Starting Means, Dual Fuel Gas/#2 Oil, Ovation Controls, Screened Air Inlet, Exhaust restacked not available, Unit has less than 2100 hours operating since last Major overhaul.

SA-32-1: GE Frame 5 LA, Unit Installed in 1969, 15,125 KW Rating, Tested at 12,900 KW, Last major overhaul (unit not operational Vibrates), Generator rewind not available,12,600 Volts, 2nd Stage Tie Wire, Electric Starting Means, Dual Fuel Gas/#2 Oil, Ovation Controls, Screened Air Inlet, Exhaust restacked not available, Unit has 0 hours operating since last Major overhaul.

SA-32-2: GE Frame 5 LA, Unit Installed in 1969, 15,125 KW Rating, Last major overhaul in 2001, Generator rewind R-2001, 12,600 Volts, 2nd Stage Tie Wire, Electric Starting Means, Dual Fuel Gas/#2 Oil, Ovation Controls, Screened Air Inlet, Exhaust restacked not available, Unit has 505 hours operating since last Major overhaul.

SA-33-1: GE Frame 5 LA, Unit Installed in 1969, 16,165 KW Rating, Tested at 14,050 KW, Last major overhaul in 1991, Generator rewind not available, 12,600 Volts, 2nd Stage Tie Wire, Diesel Starting Means, Dual Fuel Gas/#2 Oil, Ovation Controls, Screened Air Inlet, Exhaust restacked not available, Unit has 590 hours operating since last Major overhaul.

SA-33-2: GE Frame 5 LA, Unit Installed in 1969, 16,125 KW Rating, Tested at 14,050 KW, Last major overhaul in 2003, Generator rewind R-1991, 12,600 Volts, 2nd Stage Tie Wire, Electric Starting Means, Dual Fuel Gas/#2 Oil, Ovation Controls, Screened Air Inlet, Exhaust restacked by Braden, Unit has ?65 hours operating since last Major overhaul.

SA-34-1: GE Frame 5 LA, Unit Installed in 1969, 15,125 KW Rating, Tested at 14,800 KW, Last major overhaul in 1994, Generator rewind not available, 12,600 Volts, 2nd Stage Tie Wire, Electric Starting Means, Dual Fuel Gas/#2 Oil, Ovation Controls, Screened Air Inlet, Exhaust restacked not available, Unit has 1663 hours operating since last Major overhaul.



G.E. Frame 5 M
 

BL-33-3: GE Frame 5 M, last Major Overhaul 1995, 2nd Stage Tie Wire, Installed in 1971, Designed KW Rating 16, 165 Kw, using #2 Fuel, Electric Start, MK1 Controls, 13,800 Volts, Screened Inlet, Restacked in 1995 by Transco, 490 Hours since last Major Overhaul.

BL-33-4: GE Frame 5 M, Last Major Overhaul not available, 2nd Stage Tie Wire, Generator Last Rewind 1994, Installed in 1971, 16,165 Designed KW, Using #2 Fuel, Electric Start, MK1 Controls, Generator Voltage 13,800,Restacked in 1995 by Transco, Hours since last major Overhaul not available.

BL-34-1: GE Frame 5 M, Last Major Overhaul not available, 2nd Stage Tie Wire, Generator last Rewind 1994, 16,165 KW Designed Rating, Using #2 Fuel, Electric Start, MK1 Controls, Generator Voltage 13,800, screened air Inlet, Restacked in 1995 by Transco, operational Hours since last Major Overhaul not available.

BL-34-2: GE Frame 5 M, Not in operation, 2nd Stage Tie Wire, Generator does not have a rotor the stator is bad, Unit Installed in 1971, generator 16,165 KW, #2 Fuel in use, Electric starting means, 13,800 Volts, MK1 Controls, screened Inlet, Exhaust Stack re-done in 1995 by Transco, operational hours since last major overhaul not available at this time.

BL-34-4: GE Frame 5 M, last major Overhaul 1995, Unit Installed in 1971, 2nd Stage tie Wire, generator last Rewind 1994, designed for 16,165 KW, 13,800 Volts, #2 Fuel in use, Electric starting means, MK1 controls, screened Air Inlet, 475 hours of operation since last Major Overhaul.

EJ-33-4: GE Frame 5 M, Last major Overhaul in 1998, 16,200 KW rating, Unit Installed in 1971, 2nd Stage Tie Wire, Generator Last Rewind in 2001, Tested at 12,000 KW, Generator Voltage 13,800, Electric Starting Means, WDPF Controls, Screened Air Inlet, Re-stacked in 1994 by Transco, unit has 2,180 hours running since last Major overhaul.


 
 